Project Process
Stage 01
The Design Proposal
The first step to building your new dream home or renovation is creating a design that achieves the desired outcome of your build. Robson Rebuild caters for all design through to construction needs. We work closely with local draftsman and Architects that can facilitate ideas for your house and provide detailed drawings to turn them into a reality.
Stage 02
Project Documentation & Construction Approval
Development Application (DA) / Complying Development (CDC)
Actions required:
1. Section 149 Certificate from Council
2. Site Survey
3. Drawings
4. DA or CDC process
5. Approval (Pending Council or CDC). Can vary from 4 to 12 weeks
6. Engagement of required consultants. (Engineer, Hydraulic, BASIX)
7. Construction Certificate (CC). 2 to 4 weeks from approval.
*Please note that the above times are subject to specific Council requirements and may be subject to change.
Stage 03
The Building Stage
Demolition
Dig Footings
Pour Slabs / Sub-Floor Construction
Frame
Cladding and Windows (Brickwork or cladding)
Interior Fit out
Flooring
PC Items and Installation (Kitchen, Bathroom, etc.)
Project Handover
Stage 04
Final Handover and Occupation Certificate
Call us now on 1300 REBUILD (732 845) or send us an inquiry to info@robsonrebuild.com.au for a free quote.